1. (TCO 8) Of the subjoined ordain part methods, which does not violate to poise ordaining (or setup) and usurpation costs?

2. (TCO 8) All the subjoined are inputs in an MRP method, except

3. (TCO 8) Of the MRP inputs, one of the subjoined lists the assemblies, subassemblies, magnitude, and raw materials needed to amount one part of a artistic effect. Which of the subjoined is it?

4. (TCO 4) Of the MRP inputs, one of the subjoined stores notification on the status of each part by bound bound (e.g., on-hand, scheduled income, guide bound, lot extent). Which of the subjoined is it?

5. (TCO 5) Under lot-for-lot ordaining, prepared ordain income are

6. (TCO 4) In MRP, the repetition manner used to designate inferior roll requirements is called