Please review and read before accepting bid. As always, plagiarism will be checked. Part A: Creating a Work Breakdown Structure (WBS) As noted in the introduction, work breakdown structures (WBSs) are

[ad_1]

Please review and read before accepting bid. As always, plagiarism will be checked.

Don't use plagiarized sources. Get Your Custom Essay on
Please review and read before accepting bid. As always, plagiarism will be checked. Part A: Creating a Work Breakdown Structure (WBS) As noted in the introduction, work breakdown structures (WBSs) are
Just from $13/Page
Order Essay

Part A:

Creating a Work Breakdown Structure (WBS)

As noted in the introduction, work breakdown structures (WBSs) are essential for managing projects successfully, since they list all of the required tasks for a project. Two approaches for creating a WBS are top-down and bottom-up. Explain the value of creating a WBS, along with the risks of failing to put one together. Then, describe each approach along with an example of a project best suited for each approach.

At least 200 words and be supported by at least one additional professional or academic source.

Part B:

Consider which activities would be involved in the following project. The campus facilities engineering department has decided the call boxes will be solar powered and will use two-way radio communications. Your purchasing department has begun to review qualified suppliers for the call boxes. One of the potential suppliers has provided a comprehensive installation manual, the Rath Security Installation & Operations Manual(Links to an external site.), which clearly describes the installation steps. Activities required in the site preparation, hardware, installation, wiring, and testing sections could all be considered for inclusion in your project.

Conduct research on these tasks. Discuss which of these activities are dependent upon the successful completion of prior tasks. For example, site preparation would certainly have to be completed before mounting the call boxes.

Part C:

The Scope Statement

The scope statement is a critical component of project management.

In your paper,

  • Describe the contents of the scope statement.
  • Discuss the importance of the project scope as it relates to the success of a project.
  • Identify at least three issues that may result from a poor or underdeveloped scope statement.

Your paper must be 600 words in length (not including title and reference pages) and must be formatted according to APA style as outlined in the Ashford Writing Center. Contextual (Level One) headings must be used to organize your paper and your thoughts. You must cite at least two scholarly sources from the University Library in addition to the textbook.

The Scope Statement

  • Must be 600 in length (not including title and references pages) and formatted according to APA style as outlined in the Writing Center(Links to an external site.).
  • Must include a separate title page with the following:
    • Title of paper
    • Student’s name
    • Course name and number
    • Instructor’s name
    • Date submitted
  • Must use at least two scholarly sources in addition to the course text.
    • The Scholarly, Peer Reviewed, and Other Credible Sources(Links to an external site.) table offers additional guidance on appropriate source types. If you have questions about whether a specific source is appropriate for this assignment, please contact your instructor. Your instructor has the final say about the appropriateness of a specific source for a particular assignment.
  • Must document all sources in APA style as outlined in the Writing Center.

Must include a separate reference page that is formatted according to APA style as outlined in the Writing Center.

Part D:

Emergency Call Box Project – Part 2: Work Breakdown Structure

Reflecting on your Team Discussion this week, use Microsoft Project to create a Work Breakdown Structure for the emergency call boxes project. The WBS should include at least five major tasks, each with at least two subtasks. For help with using MS Project, refer to Appendix A in your textbook, or enter the phrase ‘Microsoft project for beginners videos’ in your favorite search tool to find video tutorials.

Access MS Project. The WBS must include at least five major tasks, each with at least two subtasks.



[ad_2]

Source link

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Order your essay today and save 15% with the discount code BANANA